The Skytem survey started on June 16th and was completed earlier than expected on June 22th, thanks to the relative good weather. Around 2000 km of lines were flown, mainly in the Norsminde area.
In black: Norsminde Phase 1 (100 m line spacing)
Hours of effective production: 13h26m
km of production lines: 1203 km
In red: Norsminde Phase 2 (inlines, so 50 m line spacing where it matches areas of phase 1)
Hours of effective production: 5h06m
km of production lines: 465 km
In blue: Norsminde Phase 2 (tie lines, 50 m spacing)
Hours of effective production: 1h59m
km of production lines: 178 km
Lillebæk (100m line spacing)
Hours of effective production: 1h42m
km of production lines: 161 km
You can found below some early maps. It is important to note that these are not definitive maps and that deeper processing is needed and currently in progress.
Mean resistivity between depths 25 m and 30 m in the Norsminde area obtained from flight lines of phase 1 (first inversion results with automatic processing only)
Mean resistivity between depths 25 m and 30 m in the Lillebæk area (first inversion results)